Connectivity Tutorial and Methods Development on BST

Cool; now that makes more sense.

So, a good option seems to have the individual connectivity matrices in Process 2 (A - B) and then run a Test --> Perm t-test paired.

Is there a way to implement a sliding window for the test (e.g., running the connectivity analyses on 10ms windows rather than on the entire file - and not manually changing the "time window" option?).

Shall that be scripted?