Francois, can I ask you a few more questions.
I calculated sources with Current density map, but I'm worried that I can`t see any activity on the picture. At any time. Can it be possible?
This is the pictire
After that I computed PLV connectivity with these parameters (on a pic.) and I got a graph that looks quite realistic.
Could you please check if everything was done correctly?
I am sorry, this is my first attempt to measure connectivity using Brainstorm.
In addition, one more question:
if I choose 1*N paradigm the calculation goes for one ROI and for all other brain points (not scouts! but 1 * 15000 points).
How can I fix it?
Kate


