Hi all,
I imported a 28-channel EEG data (which had been preprocessed in eeglab) to calculate the coherence between one channel and all other channels, but there was an error in the figure when I ran it at last. What shoudl i do?
Error report:
** Error: [process_cohere1] Connectivity > Coherence 1xN [2023]
** Line 137: Incorrect use of bsxfun
** The non-single dimensions of the two input arrays must match each other
** Call stack:
** >bst_xspectrum.m at 137
** >bst_connectivity.m at 937
** >process_cohere1.m>Run at 161
** >process_cohere1.m at 25
** >bst_process.m>Run at 236
** >bst_process.m at 38
** >panel_process_select.m>ShowPanel at 3262
** >panel_process_select.m at 32
** >panel_process1.m>RunProcess at 132
** >panel_process1.m at 26
** >gui_brainstorm.m>CreateWindow/ProcessRun_Callback at 777
** >bst_call.m at 28
** >gui_brainstorm.m>@(h,ev)bst_call(@ProcessRun_Callback) at 298
Many thanks for your help!
JL Zhan